Our Projects



At Alquion we believe that innovation drives our progress. We have developed state of the art laboratory facilities to validate our simulation models and next generation designs. We test stack components, validate material selection, research electrode degradation and membrane durability.
TRL 2-5
Lab Facilities


In the Pilot project we test prototype cells in a small, short stack of 50kW. The Pilot tests the cell design on functionality, safety and performance. It facilitates key design decisions in the Product Roadmap and validates the Demo design.
The Pilot is a remotely operated containerized solution located at the Technical University of Eindhoven.
TRL 6
50kW Pilot at TU/e


The 500 kW Demonstrator scales the Flexolyser from the 50 kW Pilot to a commercial-scale prototype in a real industrial environment. At Nyrstar's site in Budel, we will demonstrate fully flexible operation under industrial conditions, including frequent start-stop cycles and extended standstills, while validating safety, performance and durability.
The green hydrogen produced will be used in Nyrstar's water treatment process, replacing part of the grey hydrogen currently produced from natural gas. The Demonstrator provides the final validation step towards our first-of-a-kind Flexolyser stack and is planned to start operation in 2027.
TRL 7